Karahallı HEPP | 1.0 MW | Uşak | Feasibility Report |
Karadere İçmesuyu Regülatörü | Bolu | Feasibility Report | |
Mera HEPP | 0.86 MW | Ankara | Feasibility Report |
Eşik HEPP | 22.8 MW | Ankara | Feasibility Report |
Eğrekkaya HEPP | 0.75 MW | Ankara | Feasibility Report |
Yassıtaş Regulator and HEPP | 2.65 MW | Mersin | Feasibility Report |
Yağlıdere Regulator and HEPP | 9.51 MW | Giresun | Feasibility Report |
Lower Aras Basin Projects (5 Projects) | 411.19 MW | Kars | Feasibility Report |
Tuzluca Dam and HEPP | 34.49 MW | Iğdır | Feasibility Report |
Kovanlık HEPP | 67.30 MW | Giresun | Feasibility Report |
Aşıklar HEPP | 2.15 MW | Rize | Feasibility Report |
Ahlar HEPP | 3.5 MW | Kastamonu | Feasibility Report |
Çatalbahçe Dam and HEPP | 28.75 MW | Malatya | Feasibility Report |
Coşkun Regulator and HEPP | 12.38 MW | Antalya | Feasibility Report |
Çimen Regulator and HEPP | 13.21 MW | Çankırı | Feasibility Report |